{
	"packages": [
		{
			"id": "a",
			"name": "Gas receipt meter station",
			"basis": "120 MMSCFD custody transfer into a gathering trunk line",
			"revision": "A",
			"issued": "2026-09-29",
			"status": "Issued for review",
			"volumes": [
				{
					"n": "00",
					"name": "General",
					"pages": 54,
					"docs": [
						{
							"number": "GEN-DB-001",
							"title": "Basis of Design",
							"pages": 29,
							"landscape": false
						},
						{
							"number": "GEN-LST-001",
							"title": "Master Document Index",
							"pages": 8,
							"landscape": true
						},
						{
							"number": "GEN-LST-002",
							"title": "Master Drawing Index",
							"pages": 5,
							"landscape": true
						},
						{
							"number": "GEN-LST-003",
							"title": "HOLD Register",
							"pages": 3,
							"landscape": true
						},
						{
							"number": "GEN-RPT-002",
							"title": "Design Review Record",
							"pages": 2,
							"landscape": true
						},
						{
							"number": "GEN-RPT-003",
							"title": "Interdiscipline Check Record",
							"pages": 2,
							"landscape": true
						},
						{
							"number": "GEN-TRN-001",
							"title": "Transmittal",
							"pages": 2,
							"landscape": true
						}
					]
				},
				{
					"n": "01",
					"name": "Process",
					"pages": 155,
					"docs": [
						{
							"number": "PRO-CAL-001",
							"title": "Heat and Material Balance",
							"pages": 12,
							"landscape": true
						},
						{
							"number": "PRO-CAL-002",
							"title": "Line Sizing and Station Hydraulics",
							"pages": 5,
							"landscape": true
						},
						{
							"number": "PRO-CAL-003",
							"title": "Joule-Thomson Cooling, Hydrate and Dewpoint",
							"pages": 14,
							"landscape": false
						},
						{
							"number": "PRO-CAL-004",
							"title": "Line Heater H-101",
							"pages": 11,
							"landscape": false
						},
						{
							"number": "PRO-CAL-005",
							"title": "Filter Separator V-101",
							"pages": 10,
							"landscape": false
						},
						{
							"number": "PRO-CAL-006",
							"title": "Control Valve Sizing and Noise",
							"pages": 9,
							"landscape": false
						},
						{
							"number": "PRO-CAL-007",
							"title": "Pressure Relief Devices and Tank Venting",
							"pages": 15,
							"landscape": false
						},
						{
							"number": "PRO-CAL-008",
							"title": "Blowdown, Vent Header and Vent Stack",
							"pages": 16,
							"landscape": false
						},
						{
							"number": "PRO-CAL-009",
							"title": "Overpressure Protection System Hydraulic Analysis",
							"pages": 10,
							"landscape": false
						},
						{
							"number": "PRO-CAL-010",
							"title": "Fuel Gas System and Utility Consumption",
							"pages": 10,
							"landscape": false
						},
						{
							"number": "PRO-DS-001",
							"title": "Process Datasheet, FCV-131 and FCV-132 Flow Control Valves",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "PRO-DS-002",
							"title": "Process Datasheet, LCV-104 Filter Separator Liquid Dump Valve",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "PRO-DS-003",
							"title": "Process Datasheet, PCV-161 and PCV-162 Fuel Gas Regulators",
							"pages": 1,
							"landscape": false
						},
						{
							"number": "PRO-DS-004",
							"title": "Process Datasheet, PSV-101 Pressure Relief Valve",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "PRO-DS-005",
							"title": "Process Datasheet, PSV-157 Pressure Relief Valve",
							"pages": 1,
							"landscape": false
						},
						{
							"number": "PRO-DS-006",
							"title": "Process Datasheet, PSV-161 Pressure Relief Valve",
							"pages": 1,
							"landscape": false
						},
						{
							"number": "PRO-DS-007",
							"title": "Process Datasheet, TSV-136 Thermal Relief Valve",
							"pages": 1,
							"landscape": false
						},
						{
							"number": "PRO-DS-008",
							"title": "Process Datasheet, PVRV-193, FA-193 and EV-193 Tank Venting",
							"pages": 1,
							"landscape": false
						},
						{
							"number": "PRO-DS-009",
							"title": "Process Datasheet, H-101 Indirect-Fired Line Heater",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "PRO-DS-010",
							"title": "Process Datasheet, V-101 Filter Separator",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "PRO-DS-011",
							"title": "Process Datasheet, VS-101 Vent Stack",
							"pages": 1,
							"landscape": false
						},
						{
							"number": "PRO-DS-012",
							"title": "Process Datasheet, E-161 Electric Fuel Gas Preheater",
							"pages": 1,
							"landscape": false
						},
						{
							"number": "PRO-DS-013",
							"title": "Process Datasheet, Restriction Orifices and PSV-141B",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "PRO-RPT-001",
							"title": "Process Description and Operating Philosophy",
							"pages": 19,
							"landscape": false
						},
						{
							"number": "PRO-DWG-001",
							"title": "PROCESS FLOW DIAGRAM: STATION OVERALL, STREAMS C1 AND C2",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-002",
							"title": "PROCESS FLOW DIAGRAM: STREAM SUMMARY CASES C3 TO C7",
							"pages": 1,
							"landscape": true
						}
					]
				},
				{
					"n": "02",
					"name": "Measurement",
					"pages": 147,
					"docs": [
						{
							"number": "MEA-CAL-001",
							"title": "Ultrasonic Meter Sizing and Meter Run Design",
							"pages": 14,
							"landscape": false
						},
						{
							"number": "MEA-CAL-002",
							"title": "Measurement Uncertainty Analysis",
							"pages": 11,
							"landscape": false
						},
						{
							"number": "MEA-CAL-003",
							"title": "AGA 8 Detail and GERG-2008 Comparison and AGA 10 Speed of Sound",
							"pages": 9,
							"landscape": false
						},
						{
							"number": "MEA-CAL-004",
							"title": "Sampling System Design and Thermowell Evaluation",
							"pages": 14,
							"landscape": false
						},
						{
							"number": "MEA-DS-001",
							"title": "Multipath Ultrasonic Meters FE-111 / FE-121",
							"pages": 3,
							"landscape": false
						},
						{
							"number": "MEA-DS-002",
							"title": "Flow Conditioners FC-111 / FC-121",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "MEA-DS-003",
							"title": "Gas Chromatograph AE-141 / AT-141",
							"pages": 3,
							"landscape": false
						},
						{
							"number": "MEA-DS-004",
							"title": "Water Vapor Analyzer AT-142",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "MEA-DS-005",
							"title": "Hydrogen Sulfide Analyzer AT-143",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "MEA-DS-006",
							"title": "Oxygen Analyzer AT-144",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "MEA-DS-007",
							"title": "Composite Sampler SMP-146",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "MEA-DS-008",
							"title": "Flow Computer FQI-110",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "MEA-DS-009",
							"title": "Sample Probe SP-141",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "MEA-DS-010",
							"title": "Meter Tubes MR-110 / MR-120",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "MEA-PRC-001",
							"title": "Meter Verification and Series Comparison",
							"pages": 12,
							"landscape": false
						},
						{
							"number": "MEA-PRC-002",
							"title": "Gas Chromatograph Calibration and Verification",
							"pages": 10,
							"landscape": false
						},
						{
							"number": "MEA-PRC-003",
							"title": "FAT, SAT and Witness Testing of Measurement Systems",
							"pages": 11,
							"landscape": false
						},
						{
							"number": "MEA-PRC-004",
							"title": "Measurement Data, Audit Trail and Event Log Management",
							"pages": 10,
							"landscape": false
						},
						{
							"number": "MEA-RPT-001",
							"title": "Measurement System Design Basis and Philosophy",
							"pages": 16,
							"landscape": false
						},
						{
							"number": "MEA-SPC-001",
							"title": "Multipath Ultrasonic Meters, Flow Conditioners and Meter Tube Fabrication",
							"pages": 11,
							"landscape": false
						},
						{
							"number": "MEA-DWG-001",
							"title": "METER RUN FABRICATION DRAWING: MR-110 / MR-120, NPS 10 CLASS 600 USM RUN",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "MEA-DWG-002",
							"title": "METER SKID GENERAL ARRANGEMENT: SK-110 PLAN, SECTION A-A, MOV LINE-UP",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "MEA-DWG-003",
							"title": "ANALYZER SHELTER B-101: LAYOUT AND SAMPLE CONDITIONING SCHEMATIC",
							"pages": 1,
							"landscape": true
						}
					]
				},
				{
					"n": "03",
					"name": "Piping and Instrumentation Diagrams",
					"pages": 28,
					"docs": [
						{
							"number": "PRO-LST-101",
							"title": "P&ID Line and Tag Register",
							"pages": 10,
							"landscape": true
						},
						{
							"number": "PRO-DWG-100-1",
							"title": "P&ID LEGEND AND SYMBOLS: SHEET 1: VALVES, FITTINGS, LINES, ABBREVIATIONS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-100-2",
							"title": "P&ID LEGEND AND SYMBOLS: SHEET 2: INSTRUMENTS, INTERLOCKS, NOTES",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-101",
							"title": "P&ID STATION INLET: IJ-101, PIG RECEIVER PR-101, INLET SDV-101",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-102",
							"title": "P&ID FILTER SEPARATOR: FILTER SEPARATOR V-101 AND FUEL GAS TAKE-OFF",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-103",
							"title": "P&ID METER SKID SK-110: ULTRASONIC METER RUNS MR-110 / MR-120",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-104",
							"title": "P&ID ANALYZERS AND SAMPLING: ANALYZER SHELTER B-101, AT-141 TO AT-144, SMP-146",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-105",
							"title": "P&ID LINE HEATER H-101: INDIRECT WATER-BATH HEATER, PROCESS SIDE",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-106",
							"title": "P&ID FUEL GAS SKID FG-101: FUEL GAS CONDITIONING AND DISTRIBUTION",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-107",
							"title": "P&ID CONTROL VALVES AND OPSS: FCV-131 / FCV-132, OPSS SDV-102",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-108",
							"title": "P&ID STATION OUTLET: OUTLET AND {x} INTERCONNECT",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-109",
							"title": "P&ID VENT AND BLOWDOWN: VENT HEADER 1070 AND VENT STACK VS-101",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-110",
							"title": "P&ID DRAINS AND LIQUIDS: LIQUIDS TANK T-101 AND TRUCK LOADOUT",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-111",
							"title": "P&ID STATION ESD AND SAFETY: SIS: ESD, OPSS, PROCESS TRIPS, FIRE AND GAS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-112",
							"title": "P&ID H-101 BURNER AND BMS: FUEL TRAIN, FLAME DETECTION, BMS-150",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PRO-DWG-113",
							"title": "P&ID BPCS INTERLOCKS AND ALARMS: RTU INTERLOCKS I-07, I-10 TO I-16, STATION ALARMS",
							"pages": 1,
							"landscape": true
						}
					]
				},
				{
					"n": "04",
					"name": "Mechanical and Piping",
					"pages": 212,
					"docs": [
						{
							"number": "MEC-CAL-001",
							"title": "Pipe Wall Thickness, Hoop Stress and Buried Lateral External Loads",
							"pages": 7,
							"landscape": true
						},
						{
							"number": "MEC-CAL-002",
							"title": "Branch Connection Reinforcement",
							"pages": 12,
							"landscape": false
						},
						{
							"number": "MEC-CAL-003",
							"title": "Hydrostatic Test Calculation",
							"pages": 19,
							"landscape": false
						},
						{
							"number": "MEC-CAL-004",
							"title": "Piping Flexibility and Stress Screening",
							"pages": 22,
							"landscape": false
						},
						{
							"number": "MEC-CAL-005",
							"title": "Pipe Support Spans and Support Load Schedule",
							"pages": 16,
							"landscape": true
						},
						{
							"number": "MEC-CAL-006",
							"title": "Flange, Gasket and Bolting, and Pressure-Temperature Rating Checks",
							"pages": 15,
							"landscape": false
						},
						{
							"number": "MEC-CAL-007",
							"title": "Pig Receiver PR-101 Sizing and Closure Safety",
							"pages": 14,
							"landscape": false
						},
						{
							"number": "MEC-DS-001",
							"title": "V-101 Inlet Filter Separator Datasheet",
							"pages": 5,
							"landscape": false
						},
						{
							"number": "MEC-DS-002",
							"title": "PR-101 Inlet Pig Receiver Mechanical Datasheet",
							"pages": 4,
							"landscape": false
						},
						{
							"number": "MEC-DS-003",
							"title": "H-101 Indirect-Fired Line Heater Datasheet",
							"pages": 4,
							"landscape": false
						},
						{
							"number": "MEC-DS-004",
							"title": "T-101 Liquids Tank Datasheet",
							"pages": 3,
							"landscape": false
						},
						{
							"number": "MEC-DS-005",
							"title": "VS-101 Vent Stack Datasheet",
							"pages": 3,
							"landscape": false
						},
						{
							"number": "MEC-DS-006",
							"title": "API 6D Ball Valves (SDV, MOV and Manual)",
							"pages": 8,
							"landscape": false
						},
						{
							"number": "MEC-DS-007",
							"title": "Station Outlet Check Valve CKV-171",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "MEC-DS-008",
							"title": "Monolithic Insulating Joints IJ-101 and IJ-102",
							"pages": 3,
							"landscape": false
						},
						{
							"number": "MEC-DS-009",
							"title": "SK-110 Meter Skid Structural and Fabrication Datasheet",
							"pages": 4,
							"landscape": false
						},
						{
							"number": "MEC-LST-001",
							"title": "Line List",
							"pages": 6,
							"landscape": true
						},
						{
							"number": "MEC-LST-002",
							"title": "Mechanical Equipment List",
							"pages": 3,
							"landscape": true
						},
						{
							"number": "MEC-LST-003",
							"title": "Valve List",
							"pages": 6,
							"landscape": true
						},
						{
							"number": "MEC-LST-004",
							"title": "Tie-in List",
							"pages": 3,
							"landscape": true
						},
						{
							"number": "MEC-LST-005",
							"title": "Specialty Items List",
							"pages": 2,
							"landscape": true
						},
						{
							"number": "PIP-SPC-001",
							"title": "Piping Material Specification",
							"pages": 21,
							"landscape": false
						},
						{
							"number": "MEC-DWG-001-1",
							"title": "PLOT PLAN: OVERALL SITE PLAN",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "MEC-DWG-001-2",
							"title": "PLOT PLAN: FENCED STATION, SOUTH HALF",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "MEC-DWG-001-3",
							"title": "PLOT PLAN: FENCED STATION, NORTH HALF",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-001-1",
							"title": "PIPING GENERAL ARRANGEMENT: PLAN, SOUTH HALF (N -12 TO N 110)",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-001-2",
							"title": "PIPING GENERAL ARRANGEMENT: PLAN, NORTH HALF (N 101 TO N 223)",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-001-3",
							"title": "PIPING GENERAL ARRANGEMENT: DETAIL A, ENLARGED PLAN PR-101 / V-101 / FG-101",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-002",
							"title": "PIPING SECTIONS AND ELEVATIONS: METER SKID SK-110 AREA",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-003",
							"title": "PIPING SECTIONS AND ELEVATIONS: LINE HEATER H-101 AND CONTROL VALVE AREA",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-004",
							"title": "{x} TIE-IN, OUTLET LATERAL: 12\"-G-1041 / 1042 PLAN, PROFILE, INTERFACE",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-005",
							"title": "PIG RECEIVER PR-101 GA: PLAN, ELEVATION, SECTION, NOZZLE SCHEDULE",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-006-1",
							"title": "TYPICAL PIPE SUPPORT DETAILS: LARGE BORE SHOES, STOPS, STANDS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-006-2",
							"title": "TYPICAL PIPE SUPPORT DETAILS: SMALL BORE, VENT HEADER, TYPE SCHEDULE",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-007",
							"title": "BURIED PIPING DETAILS: SOIL-TO-AIR, TRENCH, ROAD CROSSING, FUEL RISERS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-010-1",
							"title": "ISOMETRIC LINES 1001 / 1002: PIG PATH, STATION BRANCH, SDV-101 TO V-101",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-010-2",
							"title": "ISOMETRIC LINES 1001 / 1002: BILL OF MATERIALS, CUT LIST, WELD LIST",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-011-1",
							"title": "ISOMETRIC LINES 1003 / 1010: V-101 OUTLET TO SK-110 HEADER, BYPASS 1004",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-011-2",
							"title": "ISOMETRIC LINES 1003 / 1010: BILL OF MATERIALS, CUT LIST, WELD LIST",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-012-1",
							"title": "ISOMETRIC LINES 1020 / 1021 / 1022: SK-110 OUTLET, H-101 IN / OUT AND BYPASS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-012-2",
							"title": "ISOMETRIC LINES 1020 / 1021 / 1022: BILL OF MATERIALS, CUT LIST, WELD LIST",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-013-1",
							"title": "ISOMETRIC LINES 1031 / 1032 / 1033: FCV BRANCHES AND CV OUTLET HEADER",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-013-2",
							"title": "ISOMETRIC LINES 1031 / 1032 / 1033: BILL OF MATERIALS, CUT LIST, WELD LIST",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-014-1",
							"title": "ISOMETRIC LINES 1040 / 1041: SDV-102 TO SDV-103 AND IJ-102",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-014-2",
							"title": "ISOMETRIC LINES 1040 / 1041: BILL OF MATERIALS, CUT LIST, WELD LIST",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-015-1",
							"title": "ISOMETRIC LINE 1042: OUTLET LATERAL IJ-102 TO TAP VALVE",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "PIP-DWG-015-2",
							"title": "ISOMETRIC LINE 1042: BILL OF MATERIALS, CUT LIST, WELD LIST",
							"pages": 1,
							"landscape": true
						}
					]
				},
				{
					"n": "05",
					"name": "Civil and Structural",
					"pages": 184,
					"docs": [
						{
							"number": "CIV-CAL-001",
							"title": "Earthwork and Grading",
							"pages": 13,
							"landscape": false
						},
						{
							"number": "CIV-CAL-002",
							"title": "Hydrology and Drainage",
							"pages": 16,
							"landscape": false
						},
						{
							"number": "CIV-CAL-003",
							"title": "Access and Internal Roads",
							"pages": 17,
							"landscape": false
						},
						{
							"number": "CIV-RPT-001",
							"title": "Civil Design Criteria and Site Description",
							"pages": 21,
							"landscape": false
						},
						{
							"number": "CIV-RPT-002",
							"title": "Stormwater Pollution Prevention Plan",
							"pages": 28,
							"landscape": false
						},
						{
							"number": "CIV-RPT-003",
							"title": "T-101 Secondary Containment and SPCC Design Note",
							"pages": 12,
							"landscape": false
						},
						{
							"number": "STR-CAL-001",
							"title": "Structural Design Loads",
							"pages": 15,
							"landscape": false
						},
						{
							"number": "STR-CAL-002",
							"title": "Foundation Design",
							"pages": 17,
							"landscape": false
						},
						{
							"number": "STR-CAL-003",
							"title": "Meter Skid Canopy Steel Design",
							"pages": 13,
							"landscape": false
						},
						{
							"number": "STR-CAL-004",
							"title": "Pipe Support Foundation Schedule",
							"pages": 10,
							"landscape": true
						},
						{
							"number": "CIV-DWG-001",
							"title": "VICINITY AND LOCATION MAP: SCHEMATIC",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "CIV-DWG-002",
							"title": "OVERALL SITE PLAN: TRACT, ROW, ACCESS ROAD, FENCE AND GATES",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "CIV-DWG-003",
							"title": "GRADING AND DRAINAGE PLAN: PAD, DITCHES, ENTRANCE CULVERT",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "CIV-DWG-004",
							"title": "CIVIL SECTIONS AND DETAILS: ROAD, PAD, DITCH, CULVERT, RIPRAP, FENCE",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "CIV-DWG-005",
							"title": "EROSION AND SEDIMENT CONTROL: PLAN AND BMP DETAILS (CGP / OKR10)",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "STR-DWG-001_SH1",
							"title": "FOUNDATION LOCATION PLAN: PLAN WITH FOUNDATION MARKS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "STR-DWG-001_SH2",
							"title": "FOUNDATION LOCATION PLAN: COORDINATE SCHEDULE (1 OF 2)",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "STR-DWG-001_SH3",
							"title": "FOUNDATION LOCATION PLAN: COORDINATE SCHEDULE (2 OF 2)",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "STR-DWG-001_SH4",
							"title": "FOUNDATION LOCATION PLAN: COMBINED FOOTING SCHEDULE",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "STR-DWG-002",
							"title": "V-101 AND PR-101 FOUNDATIONS: FD-01 MAT, FD-03A/B/C PIERS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "STR-DWG-003",
							"title": "H-101 LINE HEATER FOUNDATION: FD-02 MAT PLAN AND SECTIONS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "STR-DWG-004",
							"title": "SK-110 SKID AND CANOPY PIERS: PARTIAL PLAN, PIER SECTIONS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "STR-DWG-005",
							"title": "VS-101 AND T-101 CONTAINMENT: PIER, CONTAINMENT PLAN, SECTIONS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "STR-DWG-006_SH1",
							"title": "BUILDING PADS AND SUPPORTS: SLAB PLANS AND SECTIONS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "STR-DWG-006_SH2",
							"title": "BUILDING PADS AND SUPPORTS: PIPE SUPPORT FOUNDATIONS PF-1 TO PF-8",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "STR-DWG-006_SH3",
							"title": "BUILDING PADS AND SUPPORTS: ANT-201 MAST, JB-W01, DW-101 PAD",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "STR-DWG-006_SH4",
							"title": "BUILDING PADS AND SUPPORTS: COMBINED CAPS, POSTS ON MATS/PIERS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "STR-DWG-007",
							"title": "SK-110 CANOPY FRAMING: PLAN, ELEVATIONS AND DETAILS",
							"pages": 1,
							"landscape": true
						}
					]
				},
				{
					"n": "06",
					"name": "Electrical and Cathodic Protection",
					"pages": 182,
					"docs": [
						{
							"number": "CP-CAL-001",
							"title": "Cathodic Protection Design",
							"pages": 18,
							"landscape": false
						},
						{
							"number": "CP-LST-001",
							"title": "Cathodic Protection Test Station Schedule",
							"pages": 3,
							"landscape": true
						},
						{
							"number": "ELE-CAL-001",
							"title": "Electrical Load Analysis",
							"pages": 20,
							"landscape": false
						},
						{
							"number": "ELE-CAL-002",
							"title": "Standby Generator and Transfer Switch",
							"pages": 12,
							"landscape": false
						},
						{
							"number": "ELE-CAL-003",
							"title": "UPS and Battery Sizing",
							"pages": 10,
							"landscape": false
						},
						{
							"number": "ELE-CAL-004",
							"title": "Cable Sizing, Short Circuit and Arc-Flash Assessment",
							"pages": 18,
							"landscape": false
						},
						{
							"number": "ELE-CAL-005",
							"title": "Station Grounding and Bonding Design",
							"pages": 17,
							"landscape": false
						},
						{
							"number": "ELE-CAL-006",
							"title": "Lightning Risk Assessment and Protection Design",
							"pages": 13,
							"landscape": false
						},
						{
							"number": "ELE-CAL-007",
							"title": "Lighting Design",
							"pages": 15,
							"landscape": false
						},
						{
							"number": "ELE-LST-001",
							"title": "Cable Schedule",
							"pages": 5,
							"landscape": true
						},
						{
							"number": "ELE-LST-002",
							"title": "Panel Schedules",
							"pages": 4,
							"landscape": true
						},
						{
							"number": "ELE-LST-003",
							"title": "Electrical Equipment List",
							"pages": 3,
							"landscape": true
						},
						{
							"number": "ELE-RPT-001",
							"title": "Hazardous Area Classification",
							"pages": 28,
							"landscape": false
						},
						{
							"number": "CP-DWG-001",
							"title": "CATHODIC PROTECTION LAYOUT PLAN: ICCP, MG ANODES, TEST STATIONS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "CP-DWG-002",
							"title": "CATHODIC PROTECTION DETAILS: IJ, TEST STATIONS, ANODES, RECTIFIER",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "ELE-DWG-001-2",
							"title": "ONE-LINE DIAGRAM: 120 VAC UPS, 24 VDC SYSTEM, GROUNDING",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "ELE-DWG-001",
							"title": "ONE-LINE DIAGRAM: 480 V AND 208Y/120 V DISTRIBUTION",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "ELE-DWG-002",
							"title": "HAZARDOUS AREA CLASSIFICATION PLAN: API RP 500 CLASS I DIV 1 / DIV 2, GROUP D",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "ELE-DWG-003-2",
							"title": "POWER AND CONTROL CABLE ROUTING: CONDUIT AND TRENCH SCHEDULES",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "ELE-DWG-003",
							"title": "POWER AND CONTROL CABLE ROUTING PLAN: UNDERGROUND RACEWAY, HANDHOLES, RISERS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "ELE-DWG-004",
							"title": "GROUNDING AND LIGHTNING PROTECTION PLAN: STATION GROUNDING SYSTEM",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "ELE-DWG-005",
							"title": "LIGHTING PLAN: STATION AREA LIGHTING AND ILLUMINANCE",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "ELE-DWG-006",
							"title": "B-102 EQUIPMENT LAYOUT AND ELEVATIONS: CONTROL AND ELECTRICAL BUILDING 24 FT x 12 FT",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "ELE-DWG-007-2",
							"title": "TYPICAL INSTALLATION DETAILS: SHEET 2: GROUNDING, IJ, POLE, FENCE",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "ELE-DWG-007",
							"title": "TYPICAL INSTALLATION DETAILS: SHEET 1: RACEWAYS AND HAZARDOUS AREA",
							"pages": 1,
							"landscape": true
						}
					]
				},
				{
					"n": "07",
					"name": "Instrumentation, Controls and Process Safety",
					"pages": 353,
					"docs": [
						{
							"number": "INS-DS-001",
							"title": "Pressure Transmitters",
							"pages": 4,
							"landscape": false
						},
						{
							"number": "INS-DS-002",
							"title": "Temperature Elements, Thermowells and Transmitters",
							"pages": 4,
							"landscape": false
						},
						{
							"number": "INS-DS-003",
							"title": "Differential Pressure Transmitter",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "INS-DS-004",
							"title": "Guided-Wave Radar and Radar Level Transmitters",
							"pages": 3,
							"landscape": false
						},
						{
							"number": "INS-DS-005",
							"title": "Level, Pressure, Temperature and Flow Switches",
							"pages": 3,
							"landscape": false
						},
						{
							"number": "INS-DS-006",
							"title": "Shutdown Valve Actuators, Solenoid Valves and Position Switches",
							"pages": 5,
							"landscape": false
						},
						{
							"number": "INS-DS-007",
							"title": "Electric Motor-Operated Valve Actuators",
							"pages": 3,
							"landscape": false
						},
						{
							"number": "INS-DS-008",
							"title": "Electric Control Valve Actuators",
							"pages": 4,
							"landscape": false
						},
						{
							"number": "INS-DS-009",
							"title": "Gas Detectors and Fire Detection",
							"pages": 3,
							"landscape": false
						},
						{
							"number": "INS-DS-010",
							"title": "BPCS RTU/PLC",
							"pages": 3,
							"landscape": false
						},
						{
							"number": "INS-DS-011",
							"title": "Safety PLC (Logic Solver)",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "INS-DS-012",
							"title": "Pressure Gauges and Local Indicators",
							"pages": 3,
							"landscape": false
						},
						{
							"number": "INS-DS-013",
							"title": "Pig Passage Signaler",
							"pages": 2,
							"landscape": false
						},
						{
							"number": "INS-DS-014",
							"title": "Control Panels, Junction Boxes and UPS Interface",
							"pages": 7,
							"landscape": false
						},
						{
							"number": "INS-LST-001",
							"title": "Instrument Index",
							"pages": 9,
							"landscape": true
						},
						{
							"number": "INS-LST-002",
							"title": "I/O List",
							"pages": 13,
							"landscape": true
						},
						{
							"number": "INS-LST-003",
							"title": "Alarm and Trip Setpoint Schedule",
							"pages": 4,
							"landscape": true
						},
						{
							"number": "INS-LST-004",
							"title": "Cause and Effect Matrix",
							"pages": 5,
							"landscape": true
						},
						{
							"number": "INS-RPT-001",
							"title": "Control Philosophy and Functional Narrative",
							"pages": 49,
							"landscape": false
						},
						{
							"number": "INS-RPT-002",
							"title": "SCADA, Communications and Cybersecurity",
							"pages": 32,
							"landscape": false
						},
						{
							"number": "SAF-CAL-001",
							"title": "Safety Integrity Level Verification",
							"pages": 13,
							"landscape": false
						},
						{
							"number": "SAF-LST-001",
							"title": "Pre-Startup Safety Review Checklist",
							"pages": 7,
							"landscape": true
						},
						{
							"number": "SAF-RPT-001",
							"title": "Preliminary Hazard and Operability Study",
							"pages": 45,
							"landscape": false
						},
						{
							"number": "SAF-RPT-002",
							"title": "Layer of Protection Analysis",
							"pages": 21,
							"landscape": false
						},
						{
							"number": "SAF-RPT-003",
							"title": "Fire and Gas Detection Philosophy",
							"pages": 18,
							"landscape": false
						},
						{
							"number": "SAF-RPT-004",
							"title": "Facility Siting and Spacing Review",
							"pages": 20,
							"landscape": false
						},
						{
							"number": "SAF-RPT-005",
							"title": "Emergency Response Plan",
							"pages": 28,
							"landscape": false
						},
						{
							"number": "SAF-SRS-001",
							"title": "Safety Requirements Specification",
							"pages": 23,
							"landscape": false
						},
						{
							"number": "INS-DWG-001",
							"title": "CONTROL AND NETWORK ARCHITECTURE: SCADA, SIS, TELECOM, {x} I/F",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "INS-DWG-002-1",
							"title": "TYPICAL LOOP DIAGRAMS: AI 2-WIRE (PT-101), AO + FEEDBACK (FCV-131)",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "INS-DWG-002-2",
							"title": "TYPICAL LOOP DIAGRAMS: SIS 2oo3 INPUT, OPSS PT-133A/B/C",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "INS-DWG-002-3",
							"title": "TYPICAL LOOP DIAGRAMS: SDV OUTPUT WITH LIMIT SWITCHES (SDV-102)",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "INS-DWG-002-4",
							"title": "TYPICAL LOOP DIAGRAMS: MOV CONTROL (MOV-111), 3-WIRE GAS DETECTOR (GD-205)",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "INS-DWG-002-5",
							"title": "TYPICAL LOOP DIAGRAMS: FLOW COMPUTER FQI-110 SERIAL, PULSE, AI, ETHERNET",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "INS-DWG-003-1",
							"title": "INSTRUMENT LOCATION PLAN: OVERALL PLAN AND JUNCTION BOXES",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "INS-DWG-003-2",
							"title": "INSTRUMENT LOCATION PLAN: ENLARGED DETAILS A TO E",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "INS-DWG-004-1",
							"title": "INSTRUMENT HOOK-UP TYPICALS: PRESSURE, SIS PRESSURE, DP, GAUGES",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "INS-DWG-004-2",
							"title": "INSTRUMENT HOOK-UP TYPICALS: TEMPERATURE, LEVEL (GWR, RADAR), LEVEL SWITCH",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "INS-DWG-005-1",
							"title": "CONTROL PANEL LAYOUT: CP-102A RTU PANEL (B-102)",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "INS-DWG-005-2",
							"title": "CONTROL PANEL LAYOUT: CP-102B SAFETY PLC (SIS) PANEL (B-102)",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "INS-DWG-005-3",
							"title": "CONTROL PANEL LAYOUT: CP-102C, TR-102 AND B-102 FLOOR PLAN",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "SAF-DWG-001",
							"title": "FIRE AND GAS DETECTOR LAYOUT: B-101, B-102 AND H-101 BURNER END",
							"pages": 1,
							"landscape": true
						}
					]
				},
				{
					"n": "08",
					"name": "Construction Specifications",
					"pages": 294,
					"docs": [
						{
							"number": "SPC-SPC-001",
							"title": "General Requirements and Definitions",
							"pages": 17,
							"landscape": false
						},
						{
							"number": "SPC-SPC-002",
							"title": "Site Preparation, Clearing and Earthwork",
							"pages": 13,
							"landscape": false
						},
						{
							"number": "SPC-SPC-003",
							"title": "Cast-in-Place Concrete and Reinforcement",
							"pages": 14,
							"landscape": false
						},
						{
							"number": "SPC-SPC-004",
							"title": "Structural Steel, Canopy and Pipe Supports",
							"pages": 12,
							"landscape": false
						},
						{
							"number": "SPC-SPC-005",
							"title": "Aggregate Surfacing, Roads and Fencing",
							"pages": 11,
							"landscape": false
						},
						{
							"number": "SPC-SPC-006",
							"title": "Piping Fabrication and Installation",
							"pages": 22,
							"landscape": false
						},
						{
							"number": "SPC-SPC-007",
							"title": "Welding",
							"pages": 17,
							"landscape": false
						},
						{
							"number": "SPC-SPC-008",
							"title": "Nondestructive Examination",
							"pages": 16,
							"landscape": false
						},
						{
							"number": "SPC-SPC-009",
							"title": "External Coating of Buried Pipe and Field Joints",
							"pages": 13,
							"landscape": false
						},
						{
							"number": "SPC-SPC-010",
							"title": "Above-Ground Painting",
							"pages": 11,
							"landscape": false
						},
						{
							"number": "SPC-SPC-011",
							"title": "Hydrostatic Testing, Dewatering and Drying",
							"pages": 15,
							"landscape": false
						},
						{
							"number": "SPC-SPC-012",
							"title": "Tie-in, Hot Tap Coordination and Purging",
							"pages": 16,
							"landscape": false
						},
						{
							"number": "SPC-SPC-013",
							"title": "Electrical Installation in Hazardous Locations",
							"pages": 17,
							"landscape": false
						},
						{
							"number": "SPC-SPC-014",
							"title": "Instrumentation Installation, Tubing and Calibration",
							"pages": 14,
							"landscape": false
						},
						{
							"number": "SPC-SPC-015",
							"title": "Cathodic Protection Installation and Testing",
							"pages": 12,
							"landscape": false
						},
						{
							"number": "SPC-SPC-016",
							"title": "Prefabricated Buildings B-101 and B-102",
							"pages": 12,
							"landscape": false
						},
						{
							"number": "SPC-SPC-017",
							"title": "Mechanical Equipment Setting",
							"pages": 15,
							"landscape": false
						},
						{
							"number": "SPC-SPC-018",
							"title": "Pre-commissioning, Commissioning and Startup",
							"pages": 22,
							"landscape": false
						},
						{
							"number": "SPC-SPC-019",
							"title": "Inspection and Test Plan",
							"pages": 8,
							"landscape": true
						},
						{
							"number": "SPC-SPC-020",
							"title": "Construction Records and Turnover",
							"pages": 14,
							"landscape": false
						}
					]
				},
				{
					"n": "09",
					"name": "Regulatory and Construction Execution",
					"pages": 221,
					"docs": [
						{
							"number": "CON-CAL-001",
							"title": "Critical Lift Plans for H-101, V-101 and SK-110",
							"pages": 11,
							"landscape": false
						},
						{
							"number": "CON-LST-001",
							"title": "Long-Lead Procurement List and RFQ Package List",
							"pages": 5,
							"landscape": true
						},
						{
							"number": "CON-RPT-001",
							"title": "Construction Execution Plan",
							"pages": 25,
							"landscape": false
						},
						{
							"number": "CON-RPT-002",
							"title": "Contractor Scope of Work and Bid Form Structure",
							"pages": 22,
							"landscape": false
						},
						{
							"number": "CON-RPT-003",
							"title": "Construction HSE Plan",
							"pages": 24,
							"landscape": false
						},
						{
							"number": "CON-RPT-004",
							"title": "Operations and Maintenance Manual Outline",
							"pages": 22,
							"landscape": false
						},
						{
							"number": "REG-CAL-001",
							"title": "Air Emissions Inventory and Applicability",
							"pages": 13,
							"landscape": false
						},
						{
							"number": "REG-RPT-001",
							"title": "Regulatory Applicability and Compliance Matrix",
							"pages": 41,
							"landscape": false
						},
						{
							"number": "REG-RPT-002",
							"title": "Permit and Approvals Matrix and Schedule",
							"pages": 20,
							"landscape": false
						},
						{
							"number": "REG-RPT-003",
							"title": "Environmental Desktop Review Scope and Constraints",
							"pages": 18,
							"landscape": false
						},
						{
							"number": "REG-RPT-004",
							"title": "SPCC Plan Framework for T-101",
							"pages": 17,
							"landscape": false
						}
					]
				},
				{
					"n": "10",
					"name": "Cost Estimate and Schedule",
					"pages": 119,
					"docs": [
						{
							"number": "EST-EST-001",
							"title": "Basis of Estimate",
							"pages": 27,
							"landscape": false
						},
						{
							"number": "EST-EST-002",
							"title": "Detailed Cost Estimate",
							"pages": 25,
							"landscape": true
						},
						{
							"number": "EST-EST-003",
							"title": "Risk Register and Contingency Analysis",
							"pages": 15,
							"landscape": false
						},
						{
							"number": "EST-EST-004",
							"title": "Alternates and Options Pricing",
							"pages": 10,
							"landscape": false
						},
						{
							"number": "EST-EST-005",
							"title": "Estimate Summary for AFE",
							"pages": 1,
							"landscape": false
						},
						{
							"number": "EST-SCH-001",
							"title": "Project Schedule",
							"pages": 24,
							"landscape": false
						},
						{
							"number": "EST-SCH-002",
							"title": "Cash Flow Forecast",
							"pages": 10,
							"landscape": false
						},
						{
							"number": "EST-DWG-001_SH1",
							"title": "PROJECT SCHEDULE LEVEL 3 GANTT: ENGINEERING, PERMITTING AND PROCUREMENT",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "EST-DWG-001_SH2",
							"title": "PROJECT SCHEDULE LEVEL 3 GANTT: CONSTRUCTION AND COMMISSIONING",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "EST-DWG-002",
							"title": "COST S-CURVE AND MONTHLY CASH FLOW: BY COST CATEGORY, TIED TO THE LEVEL 3 CPM",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "EST-DWG-003",
							"title": "MONTE CARLO COST DISTRIBUTION: HISTOGRAM, CUMULATIVE PROBABILITY, SENSITIVITY",
							"pages": 1,
							"landscape": true
						}
					]
				}
			],
			"documents": 256,
			"pages": 1949
		},
		{
			"id": "b",
			"name": "Geothermal makeup well pad",
			"basis": "Three production wells, 210 kg/s of brine to an existing ORC plant",
			"revision": "A",
			"issued": "2026-10-02",
			"status": "Issued for review",
			"volumes": [
				{
					"n": "01",
					"name": "Drawing set",
					"pages": 8,
					"docs": [
						{
							"number": "MUF-G-001",
							"title": "COVER SHEET AND DRAWING INDEX",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "MUF-C-001",
							"title": "OVERALL SITE PLAN AND PIPELINE CORRIDOR",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "MUF-PFD-001",
							"title": "PROCESS FLOW DIAGRAM AND HEAT AND MATERIAL BALANCE",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "MUF-PID-101",
							"title": "P&ID MAKEUP PAD MP-1 WELLHEADS AND PRODUCTION HEADER",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "MUF-PID-102",
							"title": "P&ID BRINE PIPELINES AND PLANT TIE-INS",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "MUF-E-001",
							"title": "ELECTRICAL ONE-LINE DIAGRAM",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "MUF-SCH-001",
							"title": "LINE LIST AND TIE-IN SCHEDULE",
							"pages": 1,
							"landscape": true
						},
						{
							"number": "MUF-SCH-002",
							"title": "EQUIPMENT LIST AND ELECTRICAL LOAD LIST",
							"pages": 1,
							"landscape": true
						}
					]
				}
			],
			"documents": 8,
			"pages": 8
		}
	]
}